MEGA WORLD


Sustainable Regional Development

by

Public Private Partnerships

With

Mega World” Discipline

Lerzan Berkant-PPP Project Leader

Bovenweg 17 9861 GG Grootegast

The Netherlands

+31(0)627526616

www.megaprojectfinance.com

l.berkant@megaprojectfinance.com



Mega World” Discipline Introduction

Building and rebuilding cities and new communities is a complex and challenging endeavor under the best of circumstances.

Among other things, it requires merging public and private interests and resources. However, the traditional process of urban and suburban development can be inherently confrontational—an arm-wrestling contest between the local government and the developer to see which will win distinctly different prizes.

The need to rebuild and revitalize older portions of our urban areas and the public need to monetize underused assets have dramatically changed the rules of this game. No longer can private capital be relied on to pay the high price of assembling and preparing appropriate sites for re-development. No longer can local governments bear the full burden of paying the costs of requisite public infrastructure and facilities. Planning and zoning controls are often either inadequate or too inflexible to ensure either appropriate control or enablement of desired private outcomes. True partnerships replace potential confrontation with collaboration and cooperation to achieve shared goals and objectives. This process requires applying far more effort and skill to weighing, and then balancing, public and private interests and minimizing conflicts.



Today, public/private partnerships are considered “creative alliances” formed between a government entity and private developers to achieve a common purpose. Other actors have joined such partnerships—including non-governmental institutions, such as health care providers and educational institutions; non-profit associations, such as community-based organizations; and intermediary groups, such as business improvement districts. Citizens and neighborhood groups also have a stake in the process. Partnerships around the country have successfully implemented a range of pursuits from single projects to long-term plans for land use and economic growth. Partnerships have completed real estate projects such as mixed-use developments, urban renewal through land and





property assembly, public facilities such as convention centers and airports, and public services such as affordable and military housing.



Although each public/private partnership project is unique in its local implementation, most share common stages within a development process bounded by legal and political parameters. In the first phase—conceptualization and initiation—stakeholders’ opinions of the vision are surveyed and partners are selected through a competitive bid process. In the second phase, entities document the partnership and begin to define project elements, roles and responsibilities, risks and rewards, and the decision and implementation process.

Partners also negotiate the “deal” and reach agreement on all relevant terms. In the third phase, the partnership attempts to obtain support from all stakeholders, including civic groups,

local government (through entitlements), and project team members. Project financing begins and tenant commitments are secured. Finally, in the fourth phase, the partnership begins construction, leasing and occupancy, and property and asset management. However, the process is repetitious and can continue beyond the final phase when partners manage properties or initiate new projects.

A partnership is a process not a product. Successful navigation through the process results in net benefits for all parties.





Public sector entities can leverage and maximize public assets, increase their control over the development process, and create a vibrant built environment. Private sector entities are given greater access to land and infill sites and receive more support throughout the development process.







Many developers earn a market niche as a reliable partner with the public sector and are presented with an opportunity to create public goods.

With declining levels of public resources to fulfill social and physical needs and pressures for more accountability in financial investments, partnerships between public and private entities will become increasingly permanent and comprehensive in nature. In 2017, 175 billion euro was spent by public/private partnerships on economic development and urban renewal projects, indicating that the market and the public sector increasingly support this investment approach.

Thus,” Mega World presents principles to guide community leaders and public officials together with private investors and developers through the development process and highlights best practices from partnerships around the country. The principles endeavor to ensure the most efficient use of public and private resources in the pursuit of mutual gains through public/private partnerships.





















  1. Mega World Discipline” Prepares Properly for Public/Private Partnerships

Early and comprehensive preparation by both the public and private sectors is the key to successful public/private partnerships. The tasks of the public and private partners described here should not be perceived as sequential; all

are necessary for a successful partnership.


Public Partner Responsibilities:


Preparation entails creating and constantly updating a plan for development showing specific sites for private investment opportunities. In addition, the public partner must identify development goals and resources, including commitments for inducements and incentives for prioritized projects in the plan. This specificity will enable developers to understand the true scope of the development opportunities in the community.


Mega World Assesess Capabilities. In the early stages of the process, the public sector should assess its institutional capacity to act as a partner. Creating an entity to handle the partnerships, such as a redevelopment authority or a quasigovernmental agency, may be necessary if such an agency does not exist. The public partner needs to make sure it has the expertise to negotiate with the sophisticated private party and the authority to retain the use of one or more

consultants to assist in developing the partnership. Ask whether the staff of the jurisdiction can satisfactorily represent the public interests. Look at housing agencies or urban renewal authorities—such as economic development corporations, public authorities, and special purpose development corporations—as potential implementation entities and project managers. Of course, state authorizing legislation should be reviewed to make sure that the public partner has the authority to create the entity. Last, does the public agency have the capital to invest in the project to ensure its economic viability? Funding for government- imposed requirements, environmental cleanup, and the like are required at times to make the project work.












Mega World Creates a Public Vision: The vision for the program should be the result of a consensus-building process that identifies the opportunities, objectives, and ultimate goals for the community. The local government must consider and establish its long-range public interest goals and resolve any conflicts that it might have for the specific project in question. It is essential that the overall development strategy is described both verbally and graphically to ensure that both the public and the real estate community understand the program. The predevelopment process establishes how the vision can be realized and indicates the public partner’s level of preparedness to structure and implement the proposed project. The public partner must complete the following stages before issuing a developer solicitation: land assemblage and ownership, environmental analysis of the site, market demand and financial feasibility studies, as well as completion of alternative ownership, investment, development, and facility operational scenarios. Consultants can guide public entities through this process.






Mega World Prepares Legislatively : We make everything sure that building codes and regulations support the vision established for the development, including the potential for streamlining building codes and regulations to remove potential obstacles to

effective partnerships. Jurisdictions that have created one-stop permitting have been quite successful in attracting private investment by eliminating lengthy approval processes and overlapping regulations. Regulatory delays and loss of the right to develop pose the greatest risks to developers. Eliminating such risks makes a successful public/private partnership much more likely. The public sector must resolve the dilemma of the dual role of partner and land regulator.













Mega World is Resourceful with Funding. With the increasing scarcity of public sector funds, the complexity of the financial package will necessarily increase. It is, therefore, essential to be imaginative and forward thinking to capitalize on all

and any funds that might work. Identify public and nonprofit sector funding mechanisms, such as community development block grants, tax increment financing tools (where available), transportation funds, and local revolving loan funds.

Mega World prepares the Land Ready. The public partner should examine its ability to assemble the necessary land. Evaluate the capacity for the right of eminent domain. Consider the potential for land banking to avoid any land assembly issues if

the opportunity makes itself available.

Mega World manages expectations. During this stage of the process, establish a schedule that clarifies the expectations of the public decision makers. It is a good idea to craft a public awareness program to inform stakeholders of the goals of the

development strategy and the specific projects that are identified.



Private Partner Responsibilities:


First and foremost, the private partner needs to be prepared for a transparent process. Although parts of the process exist in which certain information is not disclosed, particularly during the competition over project bids, the developer

must be prepared to make its numbers, its name, and itself open to public scrutiny. The recognition and acceptance of this basic tenet should precede all other steps that the developer will take. If such transparency is not acceptable,

the developer should walk away from the project.

Mega World Assists to establishing feasibility. While the public partner is establishing clear-cut goals and projects, the private partner can be preparing by meeting with investors to explain the nature of the public/private partnership. As in all development processes, the developer must underwrite the market and determine interest. The public partner should have provided substantial background information during its preparatory phase. The developer must also identify and assess the opportunity for the project and assess whether it is feasible.




Increasingly, with the help of legislative authority the private partner submits unsolicited proposals conceptualizing and designing the use of a public/private partnership, which then is implemented with public approval.

The developer needs to make an internal assessment of the resources that are required to accomplish the project, including such items as potential staff, assessment of risk, potential deal structures (whether they will work for a fee

or be partners in the venture), potential investors, and political and community leadership and working relationships with leaders.





Mega World knows Partners. This getting-to-know-you stage will ease the subsequent stages in the development process. During the preparatory, or due diligence, stage the developer should familiarize itself with the jurisdiction’s plans, approval processes, and length of permitting processes. The developer should assess the public partner’s ability to deliver and to commit its resources up front.

Mega World gets the Right Team. If the developer decides to continue with the partnership, the developer should assemble a team who brings insight and experience with the public partner. If the developer is new to the community, it would be valuable to find local expertise to assist in the process. The developer needs to be prepared to be an explorer and adapt to what may be discovered.





  1. Mega World Discipline” Creates a Shared Vision


All successful projects start with a vision. Without a vision, the project will most likely fail. The vision is the framework for project goals and serves as the benchmark to ensure the realization of joint objectives.

Creating a vision: Creating a vision is not always easy, and it is crucial that the vision is shared. Ideally, property owners, residents, and area anchors such as churches, colleges, hospitals, homeowners associations, and other stakeholders will have “buy-in” because they have a stake in the outcome. Creating a vision involves building consensus and including all the stakeholders, even those who may be naysayers. By casting a wide net and giving all the stakeholders—including potential partners—an opportunity to help craft the vision, less possibility exists for opposition to a project. Public hearings, charrettes, visioning exercises, and other tools for involving stakeholders in the visioning process should

be used to ensure the broadest outreach. Involving the media is another key factor for two reasons. First, it helps get the message out about the visioning process, and second, it helps form an alliance with the media, which will be

crucial in articulating and publicizing the vision once it is created.





Sustaining the vision: A vision is not just pretty pictures depicting the ultimate outcome. It involves a strategy for implementation, which includes funding mechanisms (public and private), potential partners (and their



responsibilities), and an agenda or time frame for achieving the vision (making the project a reality). These components are all critical for realizing the vision and ensuring that it gets off the boards and onto the ground.

Partners should make a practical analysis of market conditions and demographics to ensure that the vision is neither too grand nor too small. An important component of the vision is specifying the scale of the project or projects that provides people with an understanding of what is going to happen. If the vision calls for building new housing, for example, it is important to talk about the density of the residential portion of the vision. Some may think the new

development will be ten units to the acre when the vision is really intended to accommodate 40 units to the acre.

Moreover, involving the stakeholders will help bring reality to the plans by establishing a collective vision and creating community buy-in for the project.

The most important component of a vision is ensuring that it can endure the test of time. Most development or redevelopment projects are long term and may span several political administrations. Thus, the vision that is created is not just the whim of the current administration, but represents key community and stakeholder buy-in that will help it endure. A shared vision that is created and embraced by key stakeholders will stand the test of time and will persevere through implementation.




3 Mega World Understands Partners and Key Players:

The beginning point of any successful partnership is for all prospective partners to invest the time and effort necessary to gain a full appreciation of, and respect for, their counterparts in a deal—their background, reputation,

experience, needs, financial strength, motivations, expectations, and goals. Choose wisely, because you want partners who will work with you, not against you. Everyone is not in the deal for the same reasons, and without such understanding, trust will never be built, and distrust may cause the deal to unravel. Public/private partnerships are a four-legged stool. They involve government, nonprofit organizations, for-profit interests, and stakeholders. Each sector plays a different role. Government should understand, for example, that the private partner needs a positive bottom line, while the private partner should understand that government does not move fast, is not necessarily profit driven, and has broader constituencies to deal with. Any deal has to answer two fundamental questions: (1) Is it financially feasible? and (2) Will it be approved?





Public partner: Government often sets the table. Typically, a government agency must validate a project’s public purpose before that agency can even consider participation. However, once this validation is affirmed, a government can acquire land, write down its cost, prepare the site, grant permits, expedite processing, build public facilities, and undertake necessary infrastructure improvements (sewers, roads, bridges). It has tools—such as tax abatement, tax increment financing (TIF), fee waivers, zoning, and even eminent domain—that it can bring to the table to incentivize the private sector and help make sure the project is financially feasible to the capital markets. Local governments can make grants, access pools of money and resources at the state and federal levels, float bonds, and raise longterm (patient) capital. And, of course, government has to approve a deal through zoning boards, commissions, city councils, mayors, and county officials, to say nothing of state and federal officials. This development approval process often comes down to political will and standing by and behind a negotiated deal in spite of public opposition. It also requires flexibility. If the public sector cannot make necessary compromises with its partners, the deal may be lost. Consultants and lawyers can help facilitate the decision-making process during negotiations.

Private partner: The for-profit part of the private sector can put together a development, layer in the financing, bring design and marketing expertise, construct a project, and operate it. Local banks can finance loans and work with credit.

Developers can access short-term capital, but being in business to make money, they generally need a quicker and significantly higher return on their investment than government, for whom time is not money. However, the public partner may be limited to debt ceilings and the annual appropriation process, restricting its ability to access large, long-term financing. The private partner, if it can see a return on its investment over a protracted period, can often be interested in

financing that covers a longer term (up to 99 years in one recent case).

Nonprofits: Nonprofit organizations, such as neighborhood organizations, community development corporations, faith-based institutions, task forces and advisory boards, intermediaries such as the Local Initiatives Support


Corporation (LISC) and the Enterprise Foundation, and philanthropic foundations, can act as brokers between public and private for-profit interests. They can help private investors find opportunities to participate in community development projects and often assist with closing the gaps in a financing package. They can also access sources of funding that might not otherwise be available to a project.

Stakeholders: Stakeholders have a right to be heard. They want to know that their voice counts and that their views are considered; however, they also need to understand that all possible objections to a project cannot be removed. Citizens must feel they can influence the course of a project, which means being made aware of plans for a project at the front end of the process and being given a chance for input throughout, through private meetings, public hearings, or both. When each partner understands the others and cooperates with them in a respectful, productive manner, the outcome will be win-win-win-win for everyone.


4-Mega World is Clear On The Risks And Rewards


Nothing ventured, nothing gained.” This old proverb captures the essence of the risk/reward relationship inherent in public/private partnerships.

Key to having such a partnership produce tangible, positive results is for each partner to understand and appreciate the nature and scope of the opposite party’s potential risks and rewards, as well as its own, so that mutual success

is achieved.

Mega World Prepares for Mutual Success


A public/private partnership is more than just a real estate deal. The responsibilities of the principal parties in the basic scenario of a real estate deal can be complex, time consuming, risky, and ultimately rewarding, and the public approval

process can be controversial and difficult. Significant obstacles must be overcome and challenges met through

joint efforts because the resources and responsibility are distributed differently between the sectors, particularly

during project implementation. What distinguishes a public/private partnership is the mutuality of effort and investment required to accomplish an outcome that is unattainable without such collaboration. Stakeholders and nonprofits similarly share in the risks and rewards created by these projects. In the public/ private partnership process, they may be affected by changes to quality of life and revenue or tax streams. The table summarizes the nature of the risks and rewards likely to be encountered by the public and private parties to a public/ private partnership. Using the “balance sheet” of factors specific to the project and its participants, as outlined in the table, is an effective way of understanding risks and rewards across the public/private divide. Where feasible, values should be quantified. Otherwise, just stating the expectations regarding relative gains or losses will suffice.



Mega World Deals with Conflicts and Uncertainty

The process of stepping beyond rigorous standard procurement and developer selection procedures is fraught with the danger of creating real or perceived conflicts of interest for public officials. Often, it is absolutely necessary that state-mandated procedures be followed in selecting the developer for a particular project before a real public/private partnership can be formed. In other instances, the local government will have broad discretion. Beyond a concern for conflicts of interest, the public partner faces an array of rich opportunities for public controversy and bad publicity associated with property acquisition or charges of misuse of public funds and other resources. The ultimate concern of the public partner is that the developer partner might fail—just drop the project, lose its financing, or even go bankrupt—and leave the community “holding the bag” for substantial additional costs and performance commitments.

However, if the selection process for the private partner is conducted properly and appropriate bonding is included in the contract, this outcome will be avoided. Most successful economic development public/private partnerships are the result of a selection process that includes verification of the technical and financial capability of the private partner.

The private partner also has its partners, stockholders, equity investors, and lenders to satisfy. They must believe that their resources are being deployed effectively. Although many of the developer’s risks are the same as in a straight private deal—sufficient effective market demand, attracting necessary debt and equity financing, and so on—certain risks are unique to a public/private partnership. The counterpoint to the public partner’s concerns regarding potential conflicts of interest is the developer’s fear of charges based on ignorance of business terms and conditions that are harmful to its reputation and ability to do future deals, for example, that it is taking unfair advantage and “profiting at public expense.” Perhaps most risky to the private party is the danger of the process taking far longer than anticipated and becoming a “black hole” for unanticipated costs. The fact that “time is money” for the developer is aggravated by the reality that a key public partner can quickly change its position or be voted out of office as a result of bad publicity, leaving the project without a necessary champion before it is fully entitled by public action.

Various types of risk are potentially encountered in public/private partnership projects:

n Market risk: Will the projected demand for space actually be realized?

n Construction risks: Will the project meet the budget and schedule?

n Ownership risks: Will all the risks of owning and operating a development, such as tenant leasing, be overcome?

n Interest-rate risk: Will the interest rate increase?

n Performance risk: Will the project achieve the public purpose for which

government justified its participation?

To minimize risk, consultants have created tools for public partners to develop financial and development safeguards that are negotiated and can be included in the development agreement between the public partner and the selected

developer.




Mega World Prepares Public/Private Partnership Rewards

On the reward side, strong, compelling reasons exist for both public and private partners to take the necessary risks and soldier on to build the partnership and implement the project. Most obvious for the public are the net economic and fiscal benefits—jobs, infrastructure, community wealth and tax base, taxes, fees— that can be produced by joint action to overcome obstacles. Less tangible is the message that the city is on the move—it is progressive in advancing the welfare of its residents. Public officials, who are only human, also seek ego gratification and recognition for their good works.

The benefits to the private developer are perhaps the most obvious and readily measured: the deal must be profitable after paying all associated costs of investment of time and resources. However, developers have a reputation to protect and build if their business is to do other deals and continue to prosper, as well as the nonfinancial returns to ego and self-esteem satisfied by a successful project. Although the risks and rewards of a particular public/private partnership may be more easily measured in the private sector, the public concerns are no less important, and a disciplined accounting of expected rewards and risks, or benefits and costs, will go a long way in demonstrating to key stakeholders and the general public alike that the deal is worth doing and is being made with all relevant factors in mind—that risks are being carefully defined and considered and steps are being taken to offset or mitigate them. Clearly, the objective of this accounting should be to show that the ultimate outcome of the partnership will be a win-win for the public and private partners as a result of their respective investments and risk taking. Conversely, if an accounting of risks and rewards fails to show such a positive outcome, good reason exists to reconsider the undertaking.


5-Mega World Establishes A Clear And Rational Decission Making Process


All parties need to articulate and agree upon the process to be followed and the rules of engagement to be used to structure a deal with public and private dimensions as early as possible. Agreement on process helps ensure

that partnerships establish effective policies and implement them efficiently and collaboratively. Furthermore, a documented decision-making process increases transparency and facilitates the sharing of information about the project.

Mega World Creates a road map: At the beginning of the partnership, after a developer has been selected, entities must define the process by which decisions are made, implemented, and reassessed. The most important step is creating a road map for decision making, with a timeline to schedule project implementation. The road map should delineate a plan of action that is maintained throughout the process, particularly during the implementation of entitlements, deal terms, financing, design and planning, and the environmental review phase. The road map formalizes joint action and party commitments to the project, consequently promoting the sharing of information, such as studies and plans, and resulting in more rational decision making. Furthermore, by establishing milestones and deadlines, the partners can

assess the project’s implementation status and each party’s activities.

Mega World defines roles and responsibilities: Entities within the partnership should also define the relationships for engagement and the various actors’ roles in the implementation of the project. In many cases, the public partner defines the expectations for private partners, particularly in terms of their role and capacities. If the proposals are clear and accurate, they provide a strong framework by which actors can jointly implement a public/private partnership. One tool many partnerships have used is the memorandum of understanding, which documents (in a succinct and summary fashion) decision-making processes and relationships between partners.

Project roles and responsibilities should also be assigned to entity representatives. Project leaders and “go to” people should be targeted to handle specific tasks. To clarify expectations and ensure accountability, partnerships should adopt documentation measures,such as performance standards and clear metrics, for each position. To ensure collaborative decision making, dispute resolution mechanisms should also be incorporated into a contract.

A widely supported and collaborative process can be achieved through the inclusion of mechanisms to ensure sufficient and appropriate involvement of stakeholders,such as task force committees, involving input from many actors, and the use of facilitators and intermediaries to build bridges between “cultures.” The formalization of the public’s role in the process also reduces the likelihood of insurmountable opposition to the partnership and its project. Mega World creates checks and balances: Finally, partnerships must create and use mechanisms to allow continuous assessment of the effectiveness of decisions and implementation

procedures. To resolve constraints, such as funding source requirements and bottlenecks in the process, partners must have the opportunity to modify the process. Furthermore, to incorporate new information and reassessed goals

into the process, parties must allow for incremental “baby step” decision making.

To overcome changing conditions, time frames, and conflicts, the process must be inherently flexible.


6-Mega World Makes Sure All Parties do Their Home Work

For any public/private partnership to be successful, all parties must do their homework—at the onset as well as throughout the project. The partners need to understand that they will have to invest time, energy, and resources at

all phases of the project.

Mega World Continues due diligence: Although due diligence is part of the preparatory stage

of a project, all partners must continue to understand all the issues—technical, social, and financial—of a project. By “doing their homework,” the partners maintain an understanding of the technical aspects of the project and can

anticipate change. In other words—don’t drop out of the process and do stay invested. Public/private partnership projects will fail when both sides do not continue to invest the resources needed to keep the project going.

Mega World Shares information: The development process can be complicated and involves many moving parts. Clearing title for the land, environmental planning and permitting, meeting local land use codes and requirements, proper design and site planning, and complying with design standards and guidelines are just a few of the many

details that need to be attended to when completing a project. All the parties need to know the status of each phase and aspect of development. All consultant work needs to be shared—and shared early. Information needs to be presented in a clear and transparent format so that everyone knows what is happening at all phases.

Mega World Adopts scenario planning: Doing your homework also includes understanding your partners’ limitations. For example, if part of the deal depends on long-term public investment, having a backup plan may be important in the event that the funding falls through because of budget cuts, changes in administrations, or emergencies.

Mega world Pursuse creative public/private finance plans: One of the great qualities of the public/ private partnership approach to development is the tremendous creativity available to solve financial and development problems. The public partner, its public/private finance and development adviser, and the selected private partner must structure the financing plan for each of the public and private building components; the plan often includes some combination of the following eight elements:

1. Multiple sources of public and private financing from the primary and secondary public and private partners or other related entities, such as county, state, and applicable federal agencies; local Business Improvement District (BID); and

other public entities. Potential secondary private partners include construction companies and facility operators.

2. Public/private financing instruments, such as revenue bonds, general obligation bonds, and soft second mortgages.

3. Long-term lease obligations by the public partner.

4. Government-owned land.

5. Credit enhancement, bond insurance, or both.

6. Development, investment, and operational incentives from different levels of government.

7. Techniques to reduce development costs; for example, the public sector can reduce the parking ratio required by the private partner.

8. Techniques to enhance cash flow, such as tax abatements, surcharges, and lease naming rights.







7-Mega World Secures Consistant and Coordinated Leadership

Any public/private partnership deal needs a champion, whether it is an individual or a small group. Why? To define clear goals; to build broad constituencies; to bring the right parties around the table; to coordinate process; to bridge private project management with political leadership; to provide stakeholders who are not financially involved but have an interest in, and expectations about, a project, with a forum to express their views; and to keep everyone on point and not let a project languish.

Leadership creates positive change. It makes a visible difference. It has to do with creating a vision, motivating others to support it, and implementing it. Therefore, leaders must be committed to realizing the final goals. The leadership

paradigm has changed considerably in the last 20 or 30 years, from a top-down command-and-obey pyramid to something more flattened out, more democratized. A good leader is a facilitator, a coach, an orchestra leader, an enabler. He or she brings people around the table and helps them move in a given direction. In a sense, the sign on a leader’s desk reads “the buck starts here,” not “the buck stops here.” Such a person takes the initiative and does not wait for some-one else to do it, and then follows through, tirelessly, patiently, painstakingly, to see the project to completion.

Leadership has to be sustained. Successful leadership persists. It does not grow weary in the middle of a project. It keeps all the parties at the table, coordinating their efforts. Many political leaders have a short lease on life—two years,four years, two terms, maybe longer—and often their successors have other ideas and undo what has been started. So, transcending administrations and political change by maximizing opportunities for putting a deal together with one set of public officials makes good sense, as does passing the baton to new leadership in both the public and private sectors, that is, to people who have the same commitment and goals. Just handing off a project will not work.

A decade ago, Max DePree, the well-known chairman of Herman Miller, Inc., came up with a checklist of leadership attributes for the book Leadership in a New Era (John Renesch, ed. San Francisco: New Leaders Press, 1994) that are

significant to the successful realization of public/private partnerships. They are:

n Integrity (“Behavior is the only score that’s kept!”)

n Vulnerability (Trust in the abilities of others, letting them do their best.)

n Discernment (What kind of antennae do you have? Can you detect nuance and perceive changing realities?)

n Awareness of the human spirit (“Person skills always precede professional skills.”)

n Courage (Face up to tough decisions, resolve conflicts, define and carry out justice, and say what needs to be said.)

n Compassionate sense of humor (It is “essential to living with ambiguity.”)

n Intellectual energy and curiosity (Accept “the responsibility for learning frantically.”)

n Respect for the future, regard for the present, understanding of the past

(“The future requires our humility in the face of all we cannot control. The present requires attention to all the people to whom we are accountable. The past gives us the opportunity to build on the work of our elders.”)

n Predictability (Leaders “are not free to follow a whim”; they are “especially responsible for the vision and values of an organization.”)

n Breadth (“Leaders are people large enough to contain multitudes.”)

n Comfort with ambiguity (A leader makes sense out of chaos.)

n Presence (“Leaders stop—to ask and answer questions, to be patient, to listen to problems, to seek the nuance, to follow up a lead.”)

In short, “Leaders stand alone, take the heat, bear the pain, tell the truth.”

8-Mega World Communicates Early And Often

The More Often the communication channels and the more they are used by each partner, the greater the prospects for a successful project outcome and lasting public/private partnership. Regular communication within the partnership

assists in the recognition of joint interests and ensures a more efficient decision-making and implementation process.

Internal communication: Communication is essential to the internal dynamics of a complex partnership structure, allowing distribution of information and implementation of compatible efforts. Initially, the partners should communicate overarching project objectives, such as downtown revitalization or increased real estate values, to find common ground within the partnership. After obtaining consensus on project goals, partners should discuss and agree

on strategies to reach those objectives. Communication is essential to the public/private partnership process for many reasons, including ensuring a more efficient decisionmaking process by facilitating the exchange of information,

ideas, and needs and creating opportunities for public involvement.

External communication: Consistent communication with a broad array of actors external to the partnership is integral

to ensure widespread support and diverse perspectives within the process. Partners should reach out, listen, and respond to stakeholders and the community, elected and appointed officials, the media, and investors. The partnership should develop a clear and concise concept of the project that can be communicated in a consistent, cohesive voice to these actors. The designation of a project spokesperson from the public and private side can help deliver a consistent message about the partnership and its objectives. Leaders can also shepherd the project through the development process by acting as negotiator in securing political and financial support. Finally, the most informed actors, the principals, should be directly involved in communicating partnership objectives. A transparent process, achieved through open communication, informationsharing, and participation in the decision process, increases the potential for broad support for public/private partnership projects, particularly from nonstakeholders. Community outreach should include public involvement or notification of the project’s planning, design, and construction stages through ongoing meetings and news updates. Sharing information with the public, however, must be timed to occur strategically in order to protect the deal from market overvaluation; for example, a partnership’s disclosure of intent to purchase property may affect land prices as well as the outcome of the overall project.


9 Mega World Negotiates A Fair Goal Structure

Fairness” is a value subject to judgment by both sides in any negotiation. Legal documentation provides evidence of the terms that all parties agreed to at closing, but fairness is often determined by subsequent

changes in fact. Because we cannot anticipate all future changes, fairness will often remain an elusive goal.

What Is “Fair”?

Fairness in negotiating a deal structure means that all parties are reasonably satisfied, at the point of closing, that they will receive the outcomes that were important enough to include in the transaction documentation. In public/private

partnerships, it is widely acceptable that the private side, in exchange for taking significant financial risk, will accrue proportionate future financial returns. The public side, in return for providing the infrastructure, entitlements, or other public resources that allow the private activity to advance, will receive sufficient tangible and intangible public benefits—such as improved public infrastructure; increased property, employment, or sales tax base; provision of needed services; clearing of blight; and nontax income and tax revenue generated by the project— that justify the required investment.

Getting to “Fair”

Negotiating a fair deal structure does not begin at the point attorneys begin documenting the transaction. It is a cumulative process that begins with some of the principles previously outlined. By the time the transaction is documented, a clear understanding of the deal structure should already be in place. Both parties should have already done their homework and evaluated their respective risks and returns. All parties critical to the transaction should already be informed of the evolution of facts as the deal proceeds to closing. Above all, mutual trust established over time will go a long way in bridging difficult negotiating issues as they invariably arise.

Some general rules to follow in achieving a fair deal structure include the following:

n Principals should spend sufficient time preparing or reviewing a detailed term sheet. The term sheet should be circulated and agreed to by all parties before documentation begins. A well-thought-out term sheet will assist in surfacing issues that need to be discussed, and it allows legal counsel to reasonably determine the intent of the parties.

n Do not let legal counsel or the documentation process drive the outcome. Only the principals retain the shared vision, understand the risks they are willing to take, and generally are able to keep the transaction on track when the inevitable unforeseen conditions arise. Transactions fail because the principals either ignore or abdicate their responsibility for supervising the negotiation.

n When possible, build in objective measures of the expected outcomes that can be used to determine the ultimate fairness of the transaction. For example, asking the private partner to spell out the expected time frames of future development and the consequences if conditions change significantly is reasonable. The same is true for public partner commitments.

n Both sides need to hire competent legal and technical counsel. If you are negotiating the terms of a tax increment financing, for example, you need counsel experienced with transactions subject to your particular state statute.

n Allow sufficient time for final negotiations and documentation. If you are faced with an immovable deadline, forced compromises may result in lasting resentment by one or both parties. On the other hand, too much time can also result in an unsatisfactory outcome and will usually mean larger legal bills.

n Understand the long-term nature of the partnership. The public sector is not going away anytime soon, and private developers, even those with short- to intermediate-term investment horizons, are still creating assets in the built environment that should last for generations. The difference in time horizons may require compromise.

n Understand that compromise is a necessary requirement for achieving a fair transaction. It is not a sign of weakness. Principals are the only parties that can keep the ultimate objectives in mind and know when compromise is appropriate.




10-Mega World Builds Trust As A Core Value

Trust is one of the overarching values to be realized from the beginning and throughout the public/private partnership process. To endure, partnerships require a foundation of trust in each partner’s commitment to the project and its objectives. Given the complex public/private partnership process and structure,

trust is required between the multiple actors and entities to enable shared decision making and taking of financial risks. Partners must also ensure that other stakeholders, such as financial investors, as well as the public are dedicated to and trust the project and the partnership.

Building Trust

Trust is tangible and can be earned through work and commitment to the project. Building trust incrementally

through small efforts within the partnership creates a record of small successes that support bigger strides. In other words, success breeds confidence, and confidence breeds trust. Parties begin to build trust in each other’s interests, capacity, and diligence toward the project during the selection process. Many approaches exist for selecting appropriate private partners that provide opportunities to verify their qualifications.

The Request for Qualifications (RFQ) is submitted by the public partner to evaluate references, track records, and

resource capacity. The RFQ provides the public sector with the ability to choose a partner in which it can trust and also helps narrow the list of competitors particularly if the public partner chooses to invite development proposals by

issuing a Request for Proposals (RFP).

Maintaining Trust

After partner selection, trust is reinforced through each partner’s realization of expected responsibilities. Reasonable performance schedules for deliverables help document the commitments of parties and ensure consistency in the implementation of the project. Partners can communicate more effectively by building personal relationships with each other. Formal and informal forms of communication between entities create opportunities to build a more open and trusting relationship. Parties must act honestly and in good faith and work under the assumption that the other

partners are doing the same. The practice of reciprocity also increases the co-operative nature of the partnership. Finally, to overcome misperceptions and differences impeding the emergence of trust, partners should work to understandthe perspective and needs of actors involved in the process. Building trust with other stakeholders and the public requires a high degree of transparency and the realization of promised objectives. Although parties may feel compelled to overpromise to secure support, good faith and reliability may be tarnished by lack of follow-through.

Overall, partners must understand that people rely upon trust to protect their interests. By pursuing mutual goals, trust can emerge among partners if the process includes mechanisms to encourage honest communication and dedication to the project. Because change is likely and reinvention becomes necessary, trust underlies the partnership’s ability to stray from the prescribed path and yet continue to collaborate to realize mutual project objectives.







THE FUTURE OF PUBLIC PRIVATE PARTNERSHIP with “MEGA WORLD DISCIPLINE”

Many of the nation’s major developments are so complex that neither a private developer nor a public entity alone can finance, design, develop, construct, and operate them. Structuring genuine public/private partnerships can

substantially enhance the ability to implement these projects. The key to success is to structure a genuine partnership based on mutual respect, understanding, and strong leadership. Also important is a fair and reasonable sharing of costs,risks, responsibilities, and economic return. Mega World Discipline illustrates the main principles of public/private partnerships. It includes all four partners—“the four legs of the stool”—for-profit private sector, nonprofit independent sector, public sector, and stakeholders (Principle 3). Also, Mega World displays the kind of vision, perseverance, and trust among partners that is essential for success (Principles 2, 7, and 10). buildings.